The BCIIP Act gives a relatively broad definition of 'building work'. It covers a number of things:

  • Any of the following activities when relating to buildings, structures or works that, permanently or not, form (or are to form) part of the land:
    • construction
    • alteration
    • extension
    • restoration
    • repair
    • demolition
    • dismantling.
  • The same activities listed above, when relating to railways (not including rolling stock) and docks.
  • The installation of fittings in any building, structure or works that form (or are to form) part of land, such as:
    • heating
    • lighting
    • air-conditioning
    • ventilation
    • power supply
    • drainage
    • sanitation
    • water supply
    • fire protection
    • security
    • communications systems.
  • Any operation that is part of any of the work described above, including:
    • site clearance, earth-moving, excavation, tunnelling or boring
    • the laying of foundations
    • the erection, maintenance or dismantling of scaffolding
    • the on-site prefabrication of made to-order components to form part of any building, structure or works
    • site restoration, landscaping or the provision of roadways and other access works.
  • Transporting or supplying goods to be used in any of the work described above directly to building sites.

The Code applies the definition of building work in the BCIIP Act with two exceptions. The following types of building work are not subject to the Code:

  • the off-site prefabrication of made-to-order components to form part of any building, structure or works, unless that work is performed on an auxiliary or holding site that is separate from the primary construction site or sites.
  • the transportation or supply of goods to be used for any of the work mentioned above (in the BCIIP Act definition of 'building work'), directly to building sites (including any resources platform) where that work is being or may be performed.
News
Commercial painting business Prolac P/L and its director Tim Petrusic have been penalised $16,200 for terminating a subcontractor’s contract on the EQ Tower project in Melbourne‘s CBD in 2017. 
24 June 2019
News
The CFMMEU has been hit with a major financial penalty with the Federal Circuit Court penalising the union and five of its officials $486,500. The union was found to have organised unlawful blockades and work disruptions targeting Sydney concreting company De Martin and Gasparini (DMG) in 2015.
2 March 2020
News
The ABCC has commenced Federal Circuit Court proceedings against the CFMMEU and three of its organisers following alleged right of entry breaches on the Cross River Rail project on 15 April this year.
6 July 2020
News
The ABCC has commenced Federal Court action alleging the CFMMEU and two of its Tasmanian officials breached right of entry laws during construction of serviced apartments in Hobart in 2019.
14 April 2020
Basic page
Under the IC Act, independent contractors are able to seek relief if they perform work on terms that are ‘unfair’ or ‘harsh’. An independent contractor also may be eligible to access remedies under the Commonwealth unfair contracts system. To be eligible, you need to be covered by the IC Act.
19 August 2018
Basic page
What is illegal Phoenix activity?
13 November 2018
Basic page
We are committed to giving employees the opportunity to stay in touch with the workplace while on periods of extended leave. Staying in touch assists employees in remaining up to date with workplace news and changes, maintain connections with colleagues and helps their transition back to work.
27 February 2020
News
The Federal Court today handed down penalties totalling $145,950 in relation to unlawful action that halted work at the Ichthys LNG Project in Darwin.
14 September 2017
News
The ABCC has today commenced Federal Circuit Court action alleging the CEPU and its official Daniel Bessell acted in an improper manner and failed to comply with site occupational health and safety requirements during a visit to a Buddina construction site in Queensland in July 2018.
29 June 2020
Legal Case
The ABCC has commenced Federal Circuit Court action alleging the CEPU and its official Daniel Bessell acted in an improper manner and failed to comply with site occupational health and safety requirements during a visit to a Buddina construction site in Queensland in July 2018.